[1]
M. A. K. Harahap, D. S. Saragih, N. M. Sianturi, D. Damanik, and R. T. A. Silalahi, “Analisis Waktu Dan Biaya Berdasarkan Produktivitas Kinerja Pada Pekerjaan Perkerasan Jalan Di Jalan Tol Tebing Tinggi – Pematangsiantar (Zona 2 Ruas Interchange Sinaksak, Sta 2+000 – 2+450)”, JSL, vol. 4, no. 2, pp. 80 –, Oct. 2023.